architects Philippines

Saturday, December 24, 2011

Swimming Pool Builders in the Philippines


Pool price depends on location, design, size, materials used, permit fees, local labor costs, depth, water features, additional accessories such as diving boards, slides, pumps, filters, automated filtration, heating, electronic chlorinators, automated cleaning systems, wireless remote controls, design add-on options such as waterfalls, landscaping, decking and other such details.

On average your Philippine pool contractor can build the pool (operational) in 60 days.

Swimming pool construction is best done by contractors using the 'dry-pack method' (very dry mix concrete laid on top of the other in clockwise or counterclockwise direction until the pool is completed). Once started, the workers will not stop until completion. This method is an assurance that leaks in any part of the pool are eliminated. The hollow blocks are acting as formworks only. Even an olympic swimmingpool will be built with this method also.15 years guarantee.
  
  
We depend on YOUR expertise; please E-mail us... or share it with your friends



No comments:

Post a Comment